Skip to main content

2025 Connection Fee Schedule - Approved February 6, 2025

Lost Hills Utility District 

Water and Sewer Connection Fees 

 

Water Connection Fees

Residential Properties in Lost Hills:

Single Family Dwelling                   $6,327.28

Multi-Family Dwelling, per unit    $5,197.85

Non Residential 

5/8" Meter                                        $12,499.84

3/4" Meter                                         $20,755.00

1" Meter                                              $30,651.12

1-1/2" Meter                                   $61,985.17

2" Meter                                             $99,091.11

3" Meter                                             $185,670.73

4" Meter                                             $288,743.84

Interstate 5 & Hwy 46 Properties 

Multi-Family Dwelling, per unit    $10,865.45

5/8" Meter                                        $13,463.45

3/4" Meter                                        $22,341.49

1" Meter                                             $32,997.98

1-1/2" Meter                                    $66,745.25

2" Meter                                            $106,706.58

3" Meter                                           $200,034.42

4" Meter                                           $310,955.60

Sewer Connection Fees: 

Within District Boundaries: 

1 Dwelling Unit per Lot                 $6,204.74

Each Additional Unit Per Lot      $9,690.64

Multi-Family, per Unit                     $6,204.74

All others, per EDU                           $9,690.64

Notes:  1) A  $352.00 Habitat fee per equivalent dwelling unit (EDU) shall be added to these connection fees ($349.00 x 1.009 increase 0.9 % increase)

Additional notes can be found on the document link below.

2025 LHUD Connection Fee Schedule.pdf

 Berrenda Mesa Area Rates 

Single Family                                    $9,536.58

5/8" Meter                                         $17,095.89

3/4" Meter                                         $28,431.89

1" Meter                                              $42,040.56

1-1/2" Meter                                     $85,129.49

2" Meter                                            $136,155.59

2025 LHUD Berrenda Mesa Area Connection Fee Schedule.pdf